Construction of the Royal Randwick spectator precinct commenced in December 2011. It featured a five level grandstand and an amphitheatre style parade ring known as the “Theatre of the Horse”.
The overall value of the project was $122M and was completed in 2014.
Icon Metal manufactured and installed spiral stairs over 21 levels as well as miscellaneous metalwork including balustrades, and parade barrier railing. The program was tightly scheduled and works were delivered on time.