Systems Connect

UGL / CPB Contractors

Client:

Year:

2021

Stage 1: Fabrication and supply of 8 rail consists that will transport materials, lifting equipment and elevated work platforms, to the excavated tunnel. They are designed to ensure that the fitout is completed safely and within nominated cycle times.

Stage 2: the consists are returned to Icon to be modified for the next stage of works